PYN/MARITIME← Selected work

SHIPBUILDING · 2021-2023

Vessel Systems Design

Firemain and HVAC systems engineering in a regulated shipbuilding environment at Mazagon Dock Shipbuilders Ltd.

Designed for the shipyard.

I supported the design of firemain and HVAC systems for 120 m, 7,700-tonne vessels. The work demanded system performance, drawing accuracy, physical integration and controlled technical documentation, all within client, shipyard and classification requirements.

Vessel scale
120 m · 7,700 tonnes
Systems
150 t/h firemain and HVAC
Tools
AutoCAD and FluidFlow
Framework
IRClass

Contribution

  • Evaluated compartment demand, pressure and flow requirements, equipment capacities and physical constraints to support component selection.
  • Modelled firemain and HVAC performance in FluidFlow against specified operating requirements.
  • Prepared and revised 2D general-arrangement and subsystem drawings in AutoCAD.
  • Resolved spatial clashes through revisions to piping routes, equipment locations and fittings.
  • Assisted with technical reports, specifications, QA plans, GRAQ documentation and Factory Acceptance Test procedures.

Project information is limited to non-confidential material in accordance with my obligations to Mazagon Dock Shipbuilders Ltd.